Integral Clients Palace Theater in West End London

The famous Palace Theatre in London’s West Home is currently home to the award-winning play, Harry Potter and the Cursed Child. The theatre first opened its doors to the public in 1891 and, today, it seats 1,400 people.

Integral was chosen for this project by Nimax Theatres Ltd. We have worked with the company on other theatre projects, including the Garrick Theatre on Charing Cross Road.

The project involved the removal of asbestos insulation residue from walls, pipes and floor surfaces within the main boiler room. We had to carry out the work while the building remained in full operation. As a result, we began shifts at 11pm each night and ended them at 6am. This allowed each day’s performance to take place.

Project: Palace Theatre, Shaftesbury Avenue, London W1D
Client: Nimax Theatres Ltd
Date: October 2019 (5 weeks)
Number of operatives: 6 – 8
Contact Integral
ACAD Accredited
CHAS Elite Accredited
Constructionline Silver Accredited
Integral British Safety Council Member
Integral SafeContractor Accredited
Integral Acclaim Accredited